Rumpus door fitted
Driveway and pathway on the way
New Kinki members arrived
Water leaking in the lounge!!
Oh my goodness!! After a heavy rain, the edges in the lounge room were wet~~
Left hand side
Right hand side
We have reported to PD and they would come to fix it as soon as possible~~
We were lucky to have a heavy rain just a few days after settlement, otherwise we will need to wait forever to fix it~~
Updates 20100802
Left hand side
Right hand side
We have reported to PD and they would come to fix it as soon as possible~~
We were lucky to have a heavy rain just a few days after settlement, otherwise we will need to wait forever to fix it~~
Updates 20100802
Carpets laid
Day 180 - Kinki Settlement Date!!
After 180-day building journey, Kinki finally born on 30 July 2010!!! =)
In the front view, it seems to remain unchanged.....it is because we still haven't done our driveway...
Our favorite - Decking in master bedroom
Our lovely switch, powerpoint and dimmer switch
Intercom
Kitchen
Blinds fitting
Ki was checking the roman blinds in master bedroom
Roman blinds in lounge
Double holland blinds in bathroom
Updated 20100730
In the front view, it seems to remain unchanged.....it is because we still haven't done our driveway...
Our favorite - Decking in master bedroom
Our lovely switch, powerpoint and dimmer switch
Intercom
Kitchen
Blinds fitting
Ki was checking the roman blinds in master bedroom
Roman blinds in lounge
Double holland blinds in bathroom
Updated 20100730
Day 158 - Installing alarm system
The temporary fences have been removed, Kinki house looks much smarter now!!
In the master bedroom, the pipe for the meter box has finally pushed outwards
In ensuite, the shower screen has been installed
It seems to be too close to the cabinet...
Where is the toilet suite?
Perhaps they reckon it is expensive and will install it in the last stage !_!
In the pantry, the tiles have been laid
Oh well...let's start the journal for the alarm installation...
Motherboard - it is like the heart of the alarm, alarm never work without it...
Keypad
External siren
To pull out the cables, we need to go above the ceiling...
Besides finding cables, we found the pipe for the air-condition above the master bedroom didn't connect. It seems like to be too short to link them together.
View of normal batten above the ceiling
View of downlight above the ceiling
Cables have been pulled out
Smart detectors have been installed and fitted
By the way, what is that in the backyard?
Updated 20100708
In the master bedroom, the pipe for the meter box has finally pushed outwards
In ensuite, the shower screen has been installed
It seems to be too close to the cabinet...
Where is the toilet suite?
Perhaps they reckon it is expensive and will install it in the last stage !_!
In the pantry, the tiles have been laid
Oh well...let's start the journal for the alarm installation...
Motherboard - it is like the heart of the alarm, alarm never work without it...
Keypad
External siren
To pull out the cables, we need to go above the ceiling...
Besides finding cables, we found the pipe for the air-condition above the master bedroom didn't connect. It seems like to be too short to link them together.
View of normal batten above the ceiling
View of downlight above the ceiling
Cables have been pulled out
Smart detectors have been installed and fitted
By the way, what is that in the backyard?
Updated 20100708